Where hyperscale data centers are built, approved, proposed, rejected, or paused near the places we research. They compete with the farm goal for water and grid capacity, drive up utility rates, spike land prices, and win long tax abatements — so we track them deliberately.

Community-reported leads via the Brockovich AI Data Center map — verified here against public records before anything is listed.

National Investigation

Data Centers in Black Neighborhoods

We joined every resident-reported data-center location to the Black population of its own ZIP code, found 74 majority-Black ZIP codes carrying reports across 20 states, and ran a full field investigation on each — the facility, the hearings, the power, the water, and who to call. The unit is the neighborhood, not the city: data centers land in the Black part of an otherwise-whiter place.

74 ZIP reports55 with a facility sited20 states
Read the national report →

Operating

9 ZIPs

Memphis

38109
94.8% Black ZIP

ZIP 38109 covers Boxtown, Walker Homes, Westwood and the southwest Memphis riverport industrial corridor. It is the single most-documented data-center environmental-justice fight in the United States.

Full report →

Cuthbert

39840
72.0% Black ZIP

The resident report is real and verifiable. Cuthbert has an operating data center. It is a bitcoin mine, not a hyperscale AI campus — and the difference matters both ways.

Full report →

Huntsville, AL (North Huntsville)

35810
69.2% Black ZIP

35810 is the largest ZIP in this Alabama cluster by population (32,705) and the only one served by TVA rather than Alabama Power. The five resident reports run 2026-05-12 → 2026-07-22, overlapping the period when TVA publicly proposed a new

Full report →

Buffalo, NY (East Side)

14215
67.5% Black ZIP

ZIP 14215 is Buffalo's East Side — the historically redlined, majority-Black core of the city. The data-center pin here is not a new proposal; it is an operating facility: the crypto-mining plant of DigiPower X Inc. (formerly Digihost Techn

Full report →

Canton / Madison County

39046
63.3% Black ZIP

ZIP 39046 (Canton) is the locus of the largest private capital investment in Mississippi history. Amazon Web Services operates a hyperscale data center campus on the Madison County Mega Site, off Highway 22 / Nissan Parkway just outside Can

Full report →

Richmond (Varina/White Oak)

23231
59.2% Black ZIP

ZIP 23231 covers eastern Henrico County — Varina, Sandston, and the White Oak

Full report →

Covington

30016
58.7% Black ZIPcounty 46.5%

Newton County is one of the two or three hottest data center fights in Georgia, and it is being fought over an 850-acre drinking water reservoir.

Full report →

Nashville

37208
56.6% Black ZIP

ZIP 37208 is North Nashville along the Jefferson Street corridor — historically the center of Black Nashville, home to Fisk University, Meharry Medical College and Tennessee State University, and the neighborhood cut apart by the routing of

Full report →

Cincinnati

45203
54.3% Black ZIP

ZIP 45203 is a small (pop 2,530), majority-Black slice of Cincinnati covering the West End and the Queensgate industrial district just west of downtown. Unlike Cleveland (a rejected hyperscale permit) or Dayton (a citywide ban), 45203 alrea

Full report →

Under construction

17 ZIPs

Union City

30291
86.2% Black ZIP

Union City is the most built-out data center site in this cluster. This is not a proposal — it is under construction.

Full report →

Montgomery

36105
82.7% Black ZIP

Montgomery's reports span the longest window of any site in this cluster — 2025-05-01 through 2026-06-14 — which tracks the construction period rather than a permitting fight. That is the distinguishing fact about 36105: the decision was al

Full report →

Birmingham, AL (Southwest — Oxmoor Valley / Ensley / Five Points West)

35211
77.5% Black ZIP

Fifteen resident reports — the highest count in this Alabama cluster — running 2026-05-25 through 2026-07-22, which brackets exactly the window of the amended lawsuit, the June zoning-ordinance vote, and the July judicial recusal.

Full report →

Conley

30288
75.2% Black ZIP

Conley is a small unincorporated community wedged between DeKalb and Clayton counties, at Atlanta's southeast corner roughly 8 miles from downtown. It has no city government — no mayor, no council, no city clerk.

Full report →

Lancaster

75134
68.1% Black ZIP

Lancaster — a majority-Black suburb in southern Dallas County — has become one of the most concentrated data-center build sites in North Texas. It is not one project but a cluster along the I-35E logistics/inland-port corridor: STACK Infras

Full report →

West Memphis

72301
63.8% Black ZIP

West Memphis 72301 sits directly across the Mississippi River from Memphis, Tennessee — about 8 miles from the Boxtown/southwest-Memphis corridor where xAI's Colossus complex is fighting an air-pollution battle. The data-center wave has now

Full report →

Hampton

30228
63.2% Black ZIPcounty 49.1%

Hampton is the most advanced site in this cluster and the one with the most resident reports — 13 between May and July 2026. That volume is earned. Hampton has gone from "no data centers" to at least three known data center sites inside a c

Full report →

Miami

33167
62.6% Black ZIP

ZIP 33167 covers Westview, Pinewood, West Little River and Gladeview — unincorporated, majority-Black north-central Miami-Dade. This is a textbook environmental-justice pattern: a 62.6% Black ZIP inside a county that is only ~15% Black, hos

Full report →

Petersburg (Prince George side)

23805
58.0% Black ZIP

ZIP 23805 covers southeastern Petersburg and the Prince George County side of the

Full report →

Nashville

37207
57.2% Black ZIP

This is the clearest "Black ZIP in a whiter county" pattern in the Tennessee set. ZIP 37207 (North Nashville / Bordeaux / Trinity Hills) is 57.2% Black. Davidson County overall is roughly 26% Black. The data center went to the Black ZIP.

Full report →

Tougaloo

39174
56.6% Black ZIP

ZIP 39174 is one of the smallest ZIP codes in Mississippi — roughly 525 people, essentially the campus and immediate surroundings of Tougaloo College, a historically Black college founded in 1869 on a former plantation and a central organiz

Full report →

Port Arthur

77640
53.5% Black ZIP

Port Arthur is a Gulf Coast refinery city whose Black-majority West Side already carries one of the heaviest pollution burdens in Texas — Motiva (the largest refinery in North America), Valero, and TotalEnergies refineries plus LNG and petr

Full report →

Chicago (South Chicago / Southeast Side)

60617
51.7% Black ZIP

ZIP 60617 is Chicago's industrial Southeast Side — South Chicago, South Deering, the East Side, and Hegewisch. It sits at the geographic center of a real, sited project, not a rumor: the Illinois Quantum and Microelectronics Park (IQMP) and

Full report →

St. George

29477
51.3% Black ZIP

Google is building a data center in St. George — at the Winding Woods Commerce Park — as one of two Dorchester County campuses (the other at Pine Hill Business Campus, Ridgeville) that together represent a reported ~$3.3 billion buildout an

Full report →

Vicksburg

39180
51.2% Black ZIP

Vicksburg is the Warren County seat, a majority-Black river city on the bluffs above the Mississippi. On November 20, 2025, Gov. Tate Reeves announced that Amazon Web Services will build a $3 billion data center campus in Warren County — th

Full report →

Fayetteville

30214
50.9% Black ZIPcounty 25.2%

QTS Data Centers (owned by Blackstone) is building what it markets as one of the world's largest multi-tenant data center campuses on ~615 acres just west of downtown Fayetteville. Internally called "Project Excalibur." Planned: up to 16 bu

Full report →

Spartanburg

29306
50.2% Black ZIP

Unlike most sites in this cluster, ZIP 29306 has a data center that is actually being built. NorthMark Strategies, through its subsidiary Valara Holdings, is constructing a ~$2.8 billion ("nearly $3 billion") high-performance/AI computing c

Full report →

Approved

10 ZIPs

Ellenwood

30294
84.0% Black ZIP

Ellenwood, GA 30294 is the most active data center front in this cluster. Two separate projects are documented, in two different counties, both inside the 30294 mailing area.

Full report →

Clarksdale

38614
76.9% Black ZIP

Clarksdale is the seat of Coahoma County in the Mississippi Delta — the birthplace-of-the-blues town at the crossroads of Highways 61 and 49. It is majority-Black (ZIP 38614 is 76.9% Black), poor, and shrinking: the city's own FAQ puts the

Full report →

Bessemer

35020
73.7% Black ZIP

Only one resident filed a report from 35020 — dated 2026-04-29, one week after the Bessemer City Council approved the rezoning. That single report sits on top of one of the largest data center proposals in the world.

Full report →

Rocky Mount

27801
70.4% Black ZIP

Two data-center efforts sit on top of Rocky Mount, and ZIP 27801 — the majority-Black east/Edgecombe side of the city — is between them. (1) Kingsboro Business Park in Edgecombe County, where Rocky Mount–based Energy Storage Solutions wants

Full report →

Indianapolis

46218
67.9% Black ZIP

California-based developer Metrobloks won approval to build a data center in the historically Black Martindale-Brightwood neighborhood on the near-northeast side of Indianapolis, on a ~14-acre former drive-in-theater/vacant lot near 25th St

Full report →

Southfield

48075
65.0% Black ZIP

Southfield City Council approved the site plan 5–2 on December 16, 2025 for a ~100 MW, ~109,700 sq ft data center by Metrobloks, LLC (a Los Angeles developer founded 2024) on ~12.19 acres of vacant land on the east side of Inkster Road, bet

Full report →

Columbus

31907
64.1% Black ZIPcounty 46.5%

Columbus and Muscogee County share one consolidated government, so a single 10-member Council makes land-use law for the whole county — including ZIP 31907, the majority-Black east side.

Full report →

Shreveport

71119
60.3% Black ZIP

ZIP 71119 covers west Shreveport — the Mooretown / Greenwood Road corridor along Interstate 20, running out toward the Shreveport Regional Airport. This is not a ZIP that merely neighbors the Caddo Parish data-center boom. The single confir

Full report →

Henderson

27536
60.1% Black ZIP

Maryland-based Natelli Investments LLC is assembling a 619-acre industrial corridor near Henderson off I-85 — combining ~113 acres of newly acquired land with the adjacent 506-acre Triangle North Vance business park. On April 20, 2026 the V

Full report →

Valdosta

31601
57.5% Black ZIPcounty 37.2%

One resident report on the map. Behind it is one of the most instructive fights in Georgia — because in Lowndes County the land was already rezoned before the public knew what for, and the developer's name only came out because a county com

Full report →

Proposed

14 ZIPs

Prichard

36610
97.2% Black ZIP

What's proposed: Edged (Edged Energy) "Project Gateway" — a ~6 MW data center at 214 Telegraph Road, Prichard, AL 36610, on roughly 9 acres at the site of the former 911 center. Stated investment ~$93 million; ~20 permanent jobs advertised

Full report →

Detroit

48213
91.9% Black ZIP

The City of Detroit issued a request for proposals (RFP) in fall 2025 for two adjacent city-owned parcels on the far east side — 11031 & 11081 Shoemaker St., roughly 14.4 acres — and at least one proposal that came back is for an AI data ce

Full report →

Hayneville

36040
91.7% Black ZIP

Only 3 residents filed reports here. That is not a sign that little is happening. It is a sign that a county of roughly 9,300 people is facing one of the largest industrial proposals in its history with the least press coverage of any site

Full report →

Ferguson / North St. Louis County

63136
90.4% Black ZIP

Residents on the Brockovich map named the developer "Blackstone/Copeland." Here is what that points to: the proposed data center would sit on the 217-acre former Emerson Electric world headquarters on West Florissant Avenue in north St. Lou

Full report →

Jackson (North Jackson)

39206
84.9% Black ZIP

ZIP 39206 is north Jackson — 84.9% Black, about 21,878 people. No data center has been approved or built inside 39206 as of 2026-08-02. But north Jackson is the front line of Mississippi's data center fight, and two live proposals sit withi

Full report →

Pocono Manor

18349
74.4% Black ZIP

ZIP 18349 is Pocono Manor, a tiny resort hamlet in Tobyhanna Township, Monroe County — home to the Kalahari Resorts & Conventions waterpark (250 Kalahari Blvd). The pin here is real and significant: Pocono Manor Investors — the landowner th

Full report →

Landover

20785
70.1% Black ZIP

Local developer Lerner Enterprises wants to build "Brightseat Tech Park," a ~$5 billion hyperscale data center campus on the ~87-acre site of the demolished Landover Mall, just off the Capital Beltway in Prince George's County. As proposed:

Full report →

Fayetteville

28301
67.9% Black ZIP

Fayetteville is one of North Carolina's most active data-center flashpoints. At least three or four separate developers have circled Cumberland County since early 2026 — a 300 MW project floated for Dunn Road, a Terra Nexus Ventures campus

Full report →

Ferguson

63135
66.2% Black ZIP

ZIP 63135 is Ferguson proper — the resident report (2026-04-30) landed the day before the postponed council vote. The data center in question is the same $1.8B proposal on the 217-acre former Emerson Electric campus documented in the compan

Full report →

Cleveland

44105
65.5% Black ZIP

In early May 2026 a Westlake developer, Sam Khouri of Lakeland Equity Group, applied for a permit to build what would have been Cleveland's largest data center — a $1.6 billion, 150-megawatt campus of three buildings on ~35 acres at 3560 E.

Full report →

Petersburg (Dinwiddie side)

23803
57.7% Black ZIP

ZIP 23803 covers western/northern Petersburg and the Dinwiddie County side of the

Full report →

Macon / Griswoldville (Jones County)

31217
56.6% Black ZIPcounty 23.9%

This is the sharpest example of the pattern in the entire Georgia cluster.

Full report →

Blakely

39823
53.2% Black ZIP

QTS Data Centers is planning a massive campus in Early County near Blakely, internally called "Project Blue Hole," first surfaced publicly by the Development Authority of Early County in November 2025. At full build-out (targeted end of 203

Full report →

Benton Harbor / Benton Township

49022
50.3% Black ZIP

A ~$3 billion, ~280-acre AI data center has been floated for Yore Avenue in Benton Charter Township, near Lake Michigan College, in ZIP 49022. It was pitched to Benton Harbor Area Schools board members in a March 28, 2024 workshop by State

Full report →

None found / resident-reported

19 ZIPs

Memphis

38106
94.6% Black ZIP

No data center facility with an address inside ZIP 38106 was found as of 2026-08-02.

Full report →

Milwaukee (Northwest Side)

53216
80.6% Black ZIP

ZIP 53216 is one of Milwaukee's Blackest neighborhoods (80.6% Black) on the city's northwest side. No data center was found sited inside or immediately adjacent to 53216 as of 2026-08-02. The pin on the community map reflects a real statewi

Full report →

South Holland

60473
74.6% Black ZIP

South Holland is a majority-Black south-suburban village in Thornton Township, Cook County (~74.6% Black by ACS ZIP data; the Village itself reported ~80% Black in 2020). No data center was found sited, proposed, or in hearing in South Holl

Full report →

Memphis

38118
73.1% Black ZIP

ZIP 38118 covers Oakhaven, Parkway Village and the industrial belt southeast of Memphis International Airport — one of the densest freight/warehouse corridors in the country, adjacent to the FedEx superhub.

Full report →

Fort Gaines

39851
72.6% Black ZIP

No data center, crypto mine, or hyperscale project is documented in Clay County, GA or the City of Fort Gaines as of 2026-08-02. No developer, no rezoning, no announced project, and no Clay County data center ordinance or moratorium.

Full report →

New Orleans

70122
68.7% Black ZIP

ZIP 70122 is Gentilly — a large, 68.7% Black residential ZIP in the northeast of Orleans Parish, running from Gentilly Boulevard and Dillard University up toward the lakefront. Unlike the Shreveport/Caddo ZIPs in this project, Gentilly is n

Full report →

Broadview

60155
63.1% Black ZIP
Full report →

Shreveport

71101
62.9% Black ZIP

ZIP 71101 is downtown Shreveport and the near-north riverfront — a small-population (6,174), 62.9% Black ZIP that functions as the command center of the entire $12 billion Caddo/Bossier data-center project. No campus is being built downtown

Full report →

Greensboro (East)

27401
61.8% Black ZIP

No data center is proposed or operating inside ZIP 27401 — the majority-Black east-central core of Greensboro — as of 2026-08-02. The relevant context is proximity: eastern Guilford County, just east of 27401, is an established data-center

Full report →

Bishopville

29010
60.9% Black ZIP

Bishopville is the seat of Lee County, one of South Carolina's poorest and Blackest rural counties (~62% Black), on the I-20 corridor in the Pee Dee/Midlands. As of 2026-08-02 there is no public record of any data center — proposed, approve

Full report →

Shreveport

71129
60.4% Black ZIP

ZIP 71129 is southwest Shreveport — the residential and light-industrial area south and west of the Greenwood Road / I-20 corridor, running toward the town of Greenwood and the Texas line. The single resident pin here is best understood as

Full report →

Dayton

45402
56.8% Black ZIP

ZIP 45402 is downtown and near-west Dayton — a majority-Black urban core inside a county that is roughly one-fifth Black. No specific data-center project has been publicly proposed or sited inside 45402 as of 2026-08-02. What is real is a c

Full report →

Brown Deer / Milwaukee (Far Northwest Side)

53223
56.6% Black ZIP

ZIP 53223 straddles the Village of Brown Deer and the far northwest side of the City of Milwaukee — so contacts depend on which side of the line an address is on. It is majority-Black (56.6%). No data center was found sited in or adjacent t

Full report →

Lexa

72355
54.3% Black ZIP

Lexa is a tiny Arkansas Delta community in northern Phillips County — one of the poorest, Blackest counties in America. A pin in a place this small matters precisely because nobody else is documenting it. Here is the honest finding after a

Full report →

Jackson (Midtown / Downtown)

39202
54.0% Black ZIP

No data center is proposed, approved, or built inside ZIP 39202 as of 2026-08-02. `Not found as of 2026-08-02.` The resident pin here is best understood as marking the place where the fight is being *decided* rather than sited: 39202 is Jac

Full report →

Baltimore

21202
51.7% Black ZIP

No specific proposed or approved new hyperscale/AI data center was found sited inside ZIP 21202 (downtown / east Baltimore) as of 2026-08-02. What is real and load-bearing here is citywide policy: on June 16, 2026, Baltimore enacted a one-y

Full report →

Shreveport

71107
50.8% Black ZIP

ZIP 71107 covers north Shreveport and the southern half of north Caddo Parish — the corridor running up US-71 and North Market Street from downtown toward Blanchard, Mooringsport, and the Arkansas/Texas line. It is the largest and northernm

Full report →

Nash

75569
50.4% Black ZIP

Nash is a small (pop ~3,601), roughly half-Black city in eastern Bowie County, wedged against Texarkana. No data center has been sited inside Nash's 75569 ZIP as of 2026-08-02 — that silence is the finding for this pin. But Bowie County is

Full report →

Jackson

38301
50.1% Black ZIP

This is a Jackson, TENNESSEE report — not Jackson, Mississippi. The two are constantly confused. Jackson, MS (the state capital, ~200 miles south) has an active, contested 230-acre data center rezoning fight and passed Tennessee-and-Mississ

Full report →

Featured — tied to our city research

Watch detail near the cities we cover

Operatingnear Memphis · In-city (South Memphis)

xAI ('Colossus')

Boxtown neighborhood, Memphis, TN

Reaction: Environmental-justice concern — sited in a historically Black neighborhood; gas-turbine emissions and permitting drew organized community + legal opposition.

Under constructionnear Muskogee (farmland track) · In-county

Core Scientific / CoreWeave

Port Muskogee, Arkansas River, OK

Size:
$4B · 100 MW HPC (2nd facility planned)

Reaction: Major in-county buildout; Oklahoma has a regulatory loophole leaving data-center water use largely untracked. No organized local opposition yet.

Approvednear Baton Rouge · ~35 mi N of Baton Rouge

Hut 8 ($2.5B Bitcoin-AI campus)

West Feliciana Parish (off LA-964), LA

Size:
~611 acres · ~300 MW
Utility:
Entergy

Reaction: Approved in an adjacent parish; Baton Rouge shares Entergy Louisiana territory, so ratepayer/grid exposure is shared even though it is not in-parish.

Approvednear Newark · In-metro

DataBank / CoreWeave / 'Galloping Hill' (multiple)

Essex & Union counties (incl. contested Kenilworth campus), NJ

Size:
250 MW + 200 MW + 250 MW (separate projects)
Utility:
PSE&G (large-load pipeline ~9.4 GW, ~90% data-center demand)

Reaction: Contested — Kenilworth put its 2026 Master Plan on hold; 60+ NJ orgs petitioned the Governor for a 3-year statewide moratorium. NJ Data Center Fair Share Act (signed 7/7/2026) forces 50MW+ projects to pre-commit to 85% of power costs.

Announcednear Baton Rouge · ~150+ mi NE (statewide Entergy signal)

Meta (flagship AI data center, $10B→~$50B)

Richland Parish, LA

Size:
~5 GW (multi-phase)
Utility:
Entergy Louisiana

Reaction: Entergy claims net customer savings; consumer advocates dispute. Not local, but a statewide rate/grid pressure signal.

Announcednear Allendale (farmland track) · ~45 mi N of Allendale

Meta ($800M / 200 MW AI data center)

Sage Mill Industrial Park, Aiken County, SC

Size:
$800M · 200 MW

Reaction: In a state with zero statewide data-center siting law; 9 SC counties have already passed or sought moratoriums. Regional watch item.

Announcednear Cleveland · Statewide signal (not Cleveland-specific)

Google (two campuses) + regional AEP Ohio load

Statewide Ohio (Google $9B; AEP visualizing 63 GW), OH

Size:
AEP Ohio: 63 GW visualized load; $78B capex through 2030

Reaction: Cleveland itself is pumping the brakes, but statewide Ohio hyperscale demand is surging — the regional pressure has not gone away.

Rejectednear Cleveland · In-city

Undisclosed hyperscaler ($1.6B project)

Slavic Village neighborhood, Cleveland, OH

Size:
35 acres · 150 MW (≈100,000+ homes of power)
Water:
Would have required new water, sewer & power connections
Utility:
Cleveland Public Power / Cleveland Water

Reaction: Permit REJECTED by the city (May 2026); council moved a 3-month standalone-data-center permitting pause to assess grid/water capacity.

As of 2026-05Axios Cleveland
Moratoriumnear Cleveland · In-city

City-wide policy (Councilman Charles Slife)

City of Cleveland, OH

Reaction: 3-month pause on new standalone data-center permitting (scaled back from an initial 1-year moratorium proposal) — governance signal that the city is protecting utility capacity.

None found nearbynear Mobile · Nearest AL hyperscale ~250+ mi away (Bessemer, Bridgeport)

Mobile / Baldwin / Washington / Clarke counties, AL

Reaction: Clean screen — a genuine positive for the water/land-price risk axis around Mobile and the Washington County farmland idea.

Methodology

How this watch is conducted

Data centers are not a neutral “economic development” data point here — they compete directly with this project's goals. Hyperscale campuses can draw hundreds of thousands to millions of gallons of water a day, strain the grid and push up everyone's utility rates, spike nearby land prices, and win 10–20-year tax abatements that shift the burden onto residents and schools. A community's response is itself a signal — and since our own long-term plan involves community-owned compute, a region's posture cuts both ways. So we screen for it deliberately.

What we search

For each city and its surrounding county — plus 1–2 adjacent counties within ~25–30 miles, since water draw, grid strain, and rezoning fights cross municipal lines — we check:

  • ·General news and local reporting
  • ·County planning / zoning agendas and rezoning applications
  • ·State utility (PSC/PUC) dockets and integrated resource plans
  • ·State water-withdrawal permits
  • ·Trade pressData Center Dynamics, Knowledge, Frontier; CBRE / JLL market reports
  • ·Hyperscaler announcementsAWS, Microsoft, Google, Meta, Oracle, xAI, QTS, Digital Realty, Equinix and peers
  • ·Community reportsthe Brockovich AI Data Center map (brockovichdatacenter.com) as a lead source; every lead is then verified against the primary sources above before it appears here

How findings are classified

Every finding is labeled by how real and how close it is:

  • ·Operatingbuilt and running
  • ·Under construction / Approvedpermits granted, work underway
  • ·Proposedapplication filed, not yet decided
  • ·Announcedpress release, no permits filed
  • ·Moratoriumlocal government paused or restricted permitting (a governance signal, not a threat)
  • ·None found nearbysearched per this method, nothing found as of the stated date

What we capture per site

For any live finding we record the developer, location and distance to the town or farm parcel, size (square feet and/or megawatts), disclosed water use, power draw, tax-abatement value and duration, the utility provider, community reaction, and the announcement or approval date — each with a dated source link.

Why it's a standing watch

Data-center buildout across the target states is moving fast (2025–2026). Every entry is date-stamped “as of” a specific day, and the screen is re-run before any actual relocation or purchase decision rather than trusted from an earlier check.

Some source links are still flagged “verify” pending a confirmed read. Every entry is date-stamped and should be re-verified before any relocation or purchase decision. This is research, not investment or legal advice.