BlackOwned

Data Center Watch Report · ZIP 30016

Covington

Newton

OperatingZIP 58.7% Blackpop 61,123county 46.5% Black

Operating (Meta, Stanton Springs) + Proposed (multiple, billions of dollars) + Moratorium (county and city both) + annexation warfare

Researched: 2026-08-02 · Lead source: Brockovich AI Data Center community map (2 resident reports, 2026-05-24 → 2026-05-28) · ZIP demographics: 58.7% Black, pop 61,123 (Census ACS 2023) · County: Newton (46.5% Black, 2020 Census) Status: Operating (Meta, Stanton Springs) + Proposed (multiple, billions of dollars) + Moratorium (county and city both) + annexation warfare


0. Snapshot

Newton County is one of the two or three hottest data center fights in Georgia, and it is being fought over an 850-acre drinking water reservoir.

The county already hosts Meta's Stanton Springs / Newton Data Center — operational since 2018, expanded to roughly 2.5 million square feet across five buildings with a reported 435 MW capacity. That campus is at Stanton Springs on I-20 in the county's far east, near Social Circle.

Since then the pipeline has exploded, and the fight has taken a shape you will not see in the other five sites in this cluster: an annexation war.

Newton County's zoning permits data centers only in the Stanton Springs overlay. Developers responded by going around the county — buying county land and asking the small cities (Covington, Social Circle, Porterdale) to annex it, because a city's zoning is not bound by the county's overlay. The county has been fighting those annexations at the Georgia Department of Community Affairs, and Social Circle now faces possible decertification over one of them.

Then both governments hit the brakes:

  • City of Covington180-day moratorium on new data center requests, enacted January 2026, plus a move to require special use permits for data centers in all zones, plus outright denial of two annexation requests (Elks Club Road and Falconwood Farms).
  • Newton County — moratoriums on data centers and convenience stores enacted 2026-02-17, then extended 180 days to 2026-10-07 while the county adopts a modified Unified Development Ordinance.

The single most important geographic fact: the proposed Gregory Road Data Center213 acres, up to 1.41 million sq ft, investment stated at up to $5.7 billion, phases from 2027 to 2036 — would sit just south of Lake Varner, the county's drinking water reservoir. Newton County's formal objection to the Covington annexation cited water supply impacts among its reasons.


1. The Facility & Where It Sits

Operating

Meta — Newton Data Center / Stanton Springs (Social Circle, GA)

ItemFinding
OwnerMeta (Facebook)
LocationStanton Springs, along I-20 near the Shire/Takeda pharmaceutical plant, ~40 miles east of Atlanta
Phase 1Broke ground 2018; ~970,000 sq ft
Phase 2Three-building expansion adding ~1.5 million sq ft to the two-building campus (2023)
Total~2.5 million sq ft, five buildings
Capacity~435 MW (expansion figure)
CoolingOutside-air cooled; Meta states 100% renewable energy
Documented resident impactFast Company reported that by 2023, pipes in a nearby resident's house were clogged with sediment, wrecking appliances and slowing faucets to a drip

That last line matters. Newton County is not speculating about what living next to a hyperscale campus is like. It has a decade of it, and a documented well-water complaint in the national press.

Proposed / in the pipeline

ProjectSizeLocationDeveloperStatus
Gregory Road Data Center213 acres, up to 1.41 million sq ft, up to $5.7B, 3 phases 2027–2036Gregory Road, which runs Alcovy Road → Flat Rock Road, just south of Lake Varner. Entrance proposed at Flat Rock Rd / Gregory RdUniversal Planning LLCDRI filed (NEGRC DRI #4428); annexation of ~520.5 acres into Covington sought, with ~213 acres rezoned to industrial M2; Newton County formally objected
Newton County Technology Park317 acres, 9 buildings, ~2.6 million sq ft, ~$5B; construction 2028–2033East of GA Highway 11, north of I-20, west of Social Circle Road, unincorporated Newton CountySC Infrastructure, a subsidiary of Technology Park Atlanta / TPA Group (Atlanta)DRI filed with Georgia DCA
Social Circle annexation campus12 buildings, ~2.5 million sq ft on ~56 acres of a ~700-acre annexationNewton County land annexed into Social CircleNot identified in located coverageAnnexation approved 3–2 on 2025-11-18; county objected to DCA; Social Circle faces possible decertification
Amazon Data Services Inc.~430 acres purchased, a portion earmarked for data center developmentCovington / Newton CountyAWSLand acquired
Serverfarm Covington~109 MWNewton CountyServerfarmListed as expected operational 2026
Elks Club Road siteElks Club Road, CovingtonAnnexation request denied and abandoned by Covington Council, January 2026
Falconwood FarmsCovington areaAnnexation request denied and abandoned, January 2026

Trade-database listings (Serverfarm, AWS acreage) are lower-confidence than the DRI filings and newspaper coverage; treat them as leads to verify, not settled fact.

Where this sits relative to ZIP 30016

Be precise about this, because it changes what a 30016 resident should worry about.

ZIP 30016 is southwestern Newton County — the Covington side toward Rockdale County. The major proposed campuses are not in 30016. Gregory Road and Lake Varner are in the county's northeast, off Alcovy Road. Stanton Springs, the Technology Park site (GA-11 / I-20 / Social Circle Road), and the Social Circle annexation are all in the county's east. No specific data center facility, application, or rezoning located inside ZIP 30016 as of 2026-08-02. Not found as of 2026-08-02.

What does reach 30016:

  1. Drinking water. Lake Varner / Cornish Creek Reservoir supplies Newton County, the City of Covington, and part of Walton County. If a 213-acre industrial campus lands on its shoreline, that is a county-wide water question, not a northeast-Newton question.
  2. Annexation. The developer playbook here is buy county land, get a city to annex it, escape the county overlay. That playbook works anywhere in the county — including near 30016. Covington's Elks Club Road and Falconwood Farms denials show it was already being tried on the Covington side.
  3. The moratoria both expire. County's runs to 2026-10-07. The city's 180 days from January 2026 has likely already lapsed.

Is it on the Black side of town? ZIP 30016 is 58.7% Black against a county figure of 46.5% — 12 points Blacker than the county. Newton County's Black share went from 25.2% in 1980 to 46.5% in 2020, concentrated in and around Covington and the county's western, more suburban side. The proposed campuses are landing in the county's rural east, but the reservoir they threaten serves the whole county, and the annexation mechanism is portable.


2. Public Hearings & Notices

DateBody / action
2025-05DRI #4428 final report issued for the Gregory Road Data Center, Northeast Georgia Regional Commission / City of Covington
2025-10-21Newton County Board of Commissioners votes in opposition to a Covington annexation involving a data center site
2025-11-18Social Circle City Council votes 3–2 to annex ~700 acres of Newton County for a 12-building, 2.5M sq ft data center
Newton County files objection with Georgia DCA, triggering arbitration: a panel of 2 city reps, 2 county reps, and an academic expert
2026-01-05City of Covington council initiates revision of data center zoning ordinances and implements a 180-day moratorium on new data center requests
2026-01-20Covington City Council — unanimous vote to enact the moratorium; second unanimous vote to begin amending ordinances to require special use permits for data centers in all zones; votes to "deny and abandon" the Elks Club Road and Falconwood Farms annexation requests, with no council discussion
2026-02-17Newton County Board of Commissioners enacts moratoriums on data centers and convenience stores
2026-02-17Social Circle notified by DCA of pending action — possible decertification over the annexation
Social Circle enacts its own 90-day moratorium on data centers, later extends it, later lifts it
2026 (date to confirm)Newton County commissioners approve a 180-day extension, carrying the moratoriums to 2026-10-07, while the county adopts a modified Unified Development Ordinance

Two live deadlines:

  • Newton County moratorium expires 2026-10-07. The county intends to have a modified Unified Development Ordinance in place by then. Whatever that UDO says about data centers is the single most consequential document for Newton County residents. Ask for the draft now, not in October.
  • City of Covington's 180-day moratorium, dated from the January 2026 action, would have lapsed around early-to-mid July 2026. Whether it was extended, and whether the "special use permit in all zones" ordinance amendment was actually adopted, is Not found as of 2026-08-02. Confirm this with the City of Covington before doing anything else.

The two reported enactment dates for the Covington moratorium — a January 5 council meeting and a January 20 unanimous vote — likely reflect first and second readings, but the record located does not resolve it. Ask the city for the ordinance number and effective date.

DRI documents are public and detailed. DRI #4428 (Gregory Road) is posted by the Northeast Georgia Regional Commission at https://negrc.org/uploads/sites/4/2025/05/DRI4428.FinalReport.pdf — it carries the applicant's own stated water, sewer, traffic, and utility demands plus agency comments. The automated fetch of this PDF returned unreadable binary on 2026-08-02; open it in a browser and read it yourself. It is the most useful single document for a Newton County resident.


3. Power

  • Meta's Stanton Springs campus: ~435 MW of expansion capacity; Meta states 100% renewable sourcing.
  • Serverfarm Covington is listed at ~109 MW.
  • Gregory Road and Newton County Technology Park megawatt figures: Not found as of 2026-08-02. For scale, a 2.6 million sq ft campus is in the same class as projects drawing 600 MW or more elsewhere in Georgia.
  • Serving utilities: Newton County is served in part by Georgia Power, in part by Snapping Shoals EMC and Walton EMC. Check your own bill — do not assume. Walton EMC is notable statewide for serving large data center load.
  • Statewide rules: since 2025-02-01, Georgia Power customers expecting 100 MW or more of peak demand must operate under customized contracts with financial guarantees, terms up to 15 years, minimum monthly payments, and PSC review 30 days before signing. The PSC ordered cost studies so residential and small-business customers do not carry generation built mainly for data centers — but PSC Public Interest Advocacy staff found large industrial customers raise average fuel costs for everyone else by roughly 5–11% per month, and a separate fuel-allocation investigation is open. Environmental groups sued the PSC in March 2026 over the Georgia Power data center expansion. Next general rate case expected 2028.
  • New substations and transmission routes for the proposed Newton campuses: Not found as of 2026-08-02. This information is typically in the DRI filings.

4. Water & Drought — Lake Varner is the whole ballgame

The water system:

  • Lake Varner, also called the Cornish Creek Reservoir — an 850-acre drinking water reservoir on Alcovy Road, built in the 1990s.
  • It supplies drinking water for Newton County, the City of Covington, and residents of Walton County.
  • The Cornish Creek Water Treatment Facility filters and disinfects up to 25 million gallons per day.
  • In addition to rainfall and runoff into the Cornish Creek basin, water is pumped from the Alcovy River and stored in Lake Varner.
  • Managed by Newton County Water Resources, a division of the Board of Commissioners. The Newton County Water & Sewerage Authority (NCWSA) handles distribution and publishes annual water quality reports.

Why this is the central fact:

  • The proposed Gregory Road Data Center sits just south of Lake Varner, with its entrance at Flat Rock Road and Gregory Road. Gregory Road runs from Alcovy Road to Flat Rock Road along the reservoir's south side.
  • Newton County's formal objection to the Covington annexation explicitly cited water supply impacts, alongside transportation concerns on Gregory Road and incompatibility with the county's land use designations.
  • The Rockdale/Newton Citizen has reported that the Newton County Water Authority learned Lake Varner levels had been allowed to drop to "dangerously low levels." A reservoir with a documented drawdown history is not a reservoir with spare capacity to hand to an industrial customer.
  • Lake Varner has also required active management of blue-green algae blooms to control treatment costs — nutrient and thermal loading near a reservoir is not a theoretical concern.

Documented downstream harm already: Fast Company reported a resident living near Meta's Stanton Springs campus whose household pipes clogged with sediment by 2023, wrecking appliances and reducing faucets to a drip. That is a specific, published, named-outlet account from this county.

Per-project water demand figures (gallons per day, cooling technology, discharge volumes) for Gregory Road, Newton County Technology Park, or the Social Circle campus: Not found as of 2026-08-02 in news coverage — but the DRI filings contain them. Get DRI #4428 (link in §10) and request the Newton County Technology Park DRI from Georgia DCA.

Drought: as of the 2026-07-14 U.S. Drought Monitor reading, about 33% of Georgia was in active drought with another 52% Abnormally Dry (D0). Earlier in 2026, Georgia's D2–D4 coverage was the highest since 2011. Newton County's weekly classification: read the live map (§10).


5. Population & Who Lives Here

  • ZIP 30016: 58.7% Black, population 61,123 (Census ACS 2023, as compiled for this project) — southwestern Newton County / west Covington. This is one of the largest-population ZIPs in the cluster.
  • Newton County: 46.45% Black, 41.56% White (2020 Census). The county's Black share was 25.24% in 1980 — it has nearly doubled in forty years.
  • 30016 is therefore roughly 12 points Blacker than the county. The county's growth has been driven by Black families moving east out of DeKalb, Rockdale, and south Atlanta into newer subdivisions on the Covington side — exactly the 30016 corridor.
  • Poverty rate, median income, and population trend for 30016: pull from data.census.gov (§10). Not independently verified in this report.

6. Money — Abatements, Incentives, Jobs

  • Investment figures announced: Gregory Road up to $5.7 billion; Newton County Technology Park about $5 billion. These are capital-expenditure claims by developers, not tax receipts.
  • Tax abatement / PILOT terms for any Newton County data center — including the existing Meta campus: Not found as of 2026-08-02. Deals of this kind in Georgia typically run through a development authority using a bond-for-title structure. For Stanton Springs the relevant body is the Joint Development Authority of Jasper, Morgan, Newton and Walton Counties (JDA); for county projects, the Newton County Industrial Development Authority. Request the executed agreements from both.
  • Permanent job counts for any of the proposed Newton campuses: Not found as of 2026-08-02. Benchmark: Columbus's 865-acre, $5B+ Project Ruby projects 195 permanent jobs.
  • Georgia's statewide sales-and-use tax exemption for high-technology data center equipment applies regardless of local deals.
  • The annexation fight is also a money fight. When county land is annexed into a city, the city collects the property tax and the county absorbs much of the road, emergency-services, and water-system impact. That is a large part of why Newton County objected at DCA rather than merely complaining.

7. Community Reaction & News Coverage

Newton County has organized opposition, engaged local government, and a state-level regulatory fight running at the same time.

  • Sustainable Newton — wrote publicly in support of the Covington data center moratorium (letter to the editor, Rockdale/Newton Citizen). The most visible local group.
  • Newton County Board of Commissioners — has been an active opponent of the annexation route, voting to object on 2025-10-21 and filing with DCA to force arbitration.
  • Covington City Council — enacted the moratorium unanimously, moved to require special use permits for data centers in all zones, and denied two annexations with no discussion, which reads as a settled position rather than a close call. Council Member Jared Rutberg put the two annexation items on the January agenda.
  • Social Circle is the pressure point: it approved the big annexation 3–2, then enacted its own 90-day moratorium, extended it, then lifted it — and is now facing possible decertification by the state.
  • DeKalb County extended its own moratorium as data center backlash grew across Georgia (SaportaReport) — Newton is part of a metro-wide pattern.

Outlets covering this closely: The Covington News (covnews.com — the best single source on this fight, though it blocks automated access; read it in a browser), Rockdale/Newton Citizen, AJC, SaportaReport, Georgia Public Broadcasting, Data Center Dynamics, Bisnow Atlanta, Govtech, Fast Company.


8. Find Out For Yourself

Newton County Board of Commissioners 1124 Clark Street, Covington, GA 30014 · (770) 784-2000 County Clerk: (678) 625-1372 Website: https://www.newtoncountyga.gov

Agendas of all meetings are made available through the County Clerk's office. Request the draft Unified Development Ordinance data center provisions from the Clerk — the moratorium expires 2026-10-07 and the UDO is what replaces it.

City of Covington 2194 Emory Street NW, Covington, GA 30014 (mailing: P.O. Box 1527, Covington, GA 30015) Phone: (770) 385-2000 · Fax: (770) 385-2060 · Hours Mon–Fri 8:00 a.m.–5:00 p.m. Website: https://cityofcovington.org Mayor: Fleeta Baggett Council: Charika Davis, Anthony Henderson, Kim Johnson, Susie Keck, Travis Moore, Jared Rutberg, Dwayne Turner Council meets 1st and 3rd Monday, 6:30 p.m. (A city clerk name and direct line were not published on the pages located as of 2026-08-02. Call (770) 385-2000 and ask for the City Clerk — do not rely on a name from a search engine; results for "Covington city clerk" frequently return Covington, Washington.)

Newton County Water Resources / Cornish Creek WTPhttps://www.newtoncountyga.gov/223/About-the-Facility · Lake Varner — https://www.newtoncountyga.gov/241/Lake-Varner Newton County Water & Sewerage Authority (NCWSA)https://ncwsa.us · Water quality reports — https://ncwsa.us/departments/water-quality/ · Distribution — https://ncwsa.us/engineering/water-distribution/

Northeast Georgia Regional Commission — DRI reviews. This is where the applicant's own water, sewer, traffic, and power numbers live.

Georgia Department of Community Affairs — DRI filings and the annexation dispute / arbitration process, including the Social Circle decertification action — https://dca.georgia.gov

Statutory legal notices: Georgia Public Notice — https://www.georgiapublicnotice.com — search Newton County. Annexation and rezoning notices must be published here. Given that the developer strategy is annexation, set an alert on both the county and the cities.

Utility rate proceedings: Georgia Public Service Commission — https://psc.ga.gov

Local news tip lines:

Community group: Sustainable Newton (published a letter to the editor supporting the Covington moratorium; contact details not located — ask The Covington News or the Rockdale/Newton Citizen).

Open-records requests worth filing (O.C.G.A. § 50-18-70 et seq.):

To the Newton County Clerk:

  1. The data center moratorium resolution, its extension, and the exact expiration date.
  2. The draft Unified Development Ordinance sections addressing data centers.
  3. The county's objection filings to DCA regarding the Covington and Social Circle annexations, and the arbitration panel record.
  4. Newton County Water Resources' current permitted withdrawal, Lake Varner safe-yield analysis, and any capacity or will-serve inquiry from a data center developer.

To the City of Covington: 5. The moratorium ordinance number, effective date, and whether it was extended. 6. The status of the ordinance amendment requiring special use permits for data centers in all zones. 7. The full annexation files for Elks Club Road and Falconwood Farms, and the Gregory Road / ~520.5-acre annexation application.


9. If You're Thinking About Moving Here

Research only. Not legal, financial, real estate, or investment advice. Verify with §10 and your own professionals.

Newton County is the most contested of the six sites in this cluster, and the fight is not settled. Two moratoria, an ordinance rewrite, a state arbitration, and a possible municipal decertification are all live at once.

What is genuinely favorable:

  • Both the county and the City of Covington have acted. Covington denied two annexations outright and is moving to require special use permits for data centers in every zone — that is a strong tool if it is adopted.
  • The county's zoning has, so far, confined data centers to the Stanton Springs overlay, which is why developers had to resort to annexation at all.
  • Water comes from a surface reservoir with a 25 MGD treatment plant, not a fragile aquifer.
  • Newton County residents have ten years of lived experience with a hyperscale campus. Talk to people near Stanton Springs before you decide anything.

What is genuinely unresolved, and it is a lot:

  • Lake Varner. A 213-acre, up-to-1.41-million-sq-ft campus proposed on the south side of the reservoir that supplies your drinking water, in a county whose water authority has already been told the lake was allowed to drop to dangerously low levels, in a state that spent 2026 in its worst drought since 2011. This is the risk.
  • The annexation loophole is still open. Covington slammed two doors; Social Circle opened one. Until the county UDO and every city's ordinance line up, the strategy of buy-county-land-then-annex remains available.
  • Both moratoria expire. County: 2026-10-07. City: 180 days from January 2026, status unconfirmed. What replaces them is being written right now, largely out of public view.
  • The scale is enormous. Meta's ~2.5M sq ft is already operating. Add Gregory Road (1.41M), Newton County Technology Park (2.6M), and the Social Circle campus (2.5M) and you are looking at roughly 9 million square feet of data center in one rural-suburban county.
  • A published account of a neighbor's plumbing being ruined by sediment. One data point, but it is on the record and it is in this county.

Land and housing: documented, sourced data-center-driven land price movement in 30016: Not found as of 2026-08-02. What is documented is developers assembling hundreds of acres at a time — 520.5 acres, 700 acres, 430 acres, 317 acres — which is upward pressure on large rural parcels, not necessarily on subdivision homes in west Covington.

Before you buy anywhere in Newton County:

  1. Determine whether the parcel is in a city or unincorporated county — that single fact determines which rules apply and whether an annexation can change them.
  2. Ask the county for the draft UDO data center language. If it does not include setbacks from residences, a cooling-technology restriction, and reservoir-watershed protection, ask why.
  3. Read DRI #4428 in a browser. It has the applicant's own numbers.
  4. Set a Georgia Public Notice alert for Newton County and for Covington, Social Circle, and Porterdale.
  5. If you are on well water anywhere near Alcovy Road or Stanton Springs, get a baseline water test now, dated and documented, before anything is built.

10. Sources

All URLs accessed 2026-08-02 unless noted. The Covington News (covnews.com) returns HTTP 403 to automated fetching; its articles are cited from the search index and should be read in a browser — it is the best local source on this story.

Moratoria, annexation, ordinances

Projects

Meta / Stanton Springs

Water

Power & PSC

Drought

Demographics

Contacts & meetings

Lead source

Lead source: resident reports on the Brockovich AI Data Center community map, then independently verified against public records. Research, not legal, financial, real-estate, or investment advice. Some resident-reported pins remain uncorroborated and are labeled as such above.